We need to build about 16 timber, gravel and paver steps, along with handrails, along a sloped section of pathway. Will involve digging, placing and securing 6x6 timbers, digging and placing posts for handrails, backfilling with gravel and topping steps with concrete pavers.
We need to install about 10 fence posts in concrete (on May 29). Involves digging post holes (some by hand, others with tractor), installing posts and pouring concrete to secure
On May 30 we will attach chain link fencing to the posts we set on the 29th. We will also install and adjust a couple of gates. We could use a fence stretcher if anyone has one! Bring gloves.
There is a section behind the main building that needs some drainage revision to direct rainwater away from the foundation. We will need to move about 2 yards of dirt by wheelbarrow (a short distance), create the berm to direct the water, line an existing drainage ditch with vis-queen, and fill the ditch with drain rock. Volunteers will need shovels, garden rakes, and wheel barrows.
We will also need a team to clean out a number of flower/ perennial beds.